Skip to main content

Installing New Puck Systems and Cutting Edges

9:50
17:05
46.9K views

At 9:50 in

Rebuilding a Worn out & Abandoned Old Snow Pusher 4 k

What happens here

New, improved puck systems, cutting edges, and associated hardware are installed. The new cutting edges are made of carbide, designed for harder surfaces like concrete, offering enhanced durability. The installation of these components requires precise alignment and secure fastening. The team uses impact wrenches for tightening bolts and discusses the appropriate sequence for installing moldboard sections (starting from one end and working to the other to avoid blocking access to fasteners). Safety gear, including gloves and safety glasses, is continuously worn by the workers. The use of a skid-steer loader is observed again to lift the plow, providing better access for tightening bolts.

Goal: The team installs the new puck systems, cutting edges, and updated mounting hardware onto the now cleaned and prepared plow frame. This step requires careful alignment and secure fastening of all components.

Tools and materials

  • Carbide Cutting Edges
  • Impact Wrench
  • New Pucks
  • Safety Glasses
  • Skid-Steer Loader
  • Work Gloves
  • Wrenches

What they say

Hide

so here's the deal you guys Lucas keeps trying to use minimum tools like if you guys were stuck out in a snow blizzard or whatever whatever some guys don't have a massive acetylene torch laying around you know so let's just pretend you do all right now we're pretending we do so like I said earlier we originally were just trying to rebuild this he's in an emergency field kit but this project needed a little bit of extra work this isn't even in place laminate - so since none of us have ever rebuilt a pusher to this extent we prematurely hung the mounting plate on not realizing we were cutting off access to the pucks behind you so we've got to pull every single moldboard section off and that allows us better access if those rusty bolts holding those putts on [Music] good snug them up and then 20 to go [Applause] so now we go into cheat mode and we're just going to cut off the entire bottom bracket because all right so we're gonna go with a carbide cutting edge right yeah because this do you guys design this for what harder surfaces like concrete yeah concrete customers that want the edge of the last even longer typically concrete is the number one need but you guys have three cutting edges don't ya yes we got the standard 5/8 thick we have a 3/4 inch those are both are 400 and then this is I believe in a are 500 material heat treated with a carbide inlay so when we reinstall the moldboard you'd like to start from the center and work out in general it's easiest to start on one end go the other low because then that way you can get your hands around all the fasteners because if you put the middle one on then you kind of block yourself on two sides already does that make any sense [Music] I've never done this before you guys like out of that all right No so you probably noticed that all of the new hardware Puck's Springs cutting edges was actually installed with each moldboard section off from the frame of the machine now that we've got that done we've got to stick everything back together again we've cut through all the way through on the ball board now instead of replacing the mall board we're gonna actually weld a boss plate onto it which is the way the new design is anyway so this is since this is an older one you can see they've got a boss plate on the outside but on the new ones they've got them on the outside and inside just like the center pin so washers on the inch new washers on the inside and outside then we line up the bolts and you put a cotter pin…

Auto-generated from the video audio.