Slope Reshaping and Fine Grading
At 0:44 in
Rebuilding a FAILED retaining wall & Testing NEW Equipment 4 k video
What happens here
After the initial clearing, the project shifts focus to reshaping the hillside. The video highlights a cost-effective decision to sculpt the slope rather than rebuild the retaining wall, which would have been triple the cost. The compact track loader is used to precisely move and spread fill dirt, sculpting the slope into a gradual and stable incline. A specialized Hydro Bucket from CMP Attachments, which includes a scarifier, is then attached to the loader for fine grading, ensuring the surface is smooth and ready for subsequent steps. The operator demonstrates the precise control needed for this delicate earthwork.
Goal: Reshape the hillside into a stable, usable slope and prepare it for seeding.
Tools and materials
- Hydro Bucket — Spreading and fine-grading soil for a smooth finish and preparing for seeding
- Fill Dirt N/A — Building up and reshaping the slope
What they say
(587 characters)Hide
What they say
(587 characters)Auto-generated from the video audio.