Initial Site Clearing and Debris Removal
0:00
17:06
33K views
At 0:00 in
Rebuilding a FAILED retaining wall & Testing NEW Equipment 4 k video
What happens here
The video begins by showcasing a collapsed timber retaining wall, explaining the project's necessity. A compact track loader, specifically an ASV RT-75 Posi-Track model fitted with a CASE-branded loader bucket, is used for the initial site clearing. This involves moving large quantities of soil and debris, including wood from the failed wall, to relocate excess material and prepare the area for reshaping. Some of the removed soil is loaded into a dump truck for off-site disposal.
Goal: Clear the collapsed retaining wall and surrounding debris to prepare the site for reshaping.
Tools and materials
- Dump Truck — Transporting removed soil and debris off-site
- Loader Bucket CASE — Scooping and transporting soil, wood, and other debris
- Collapsed Retaining Wall Debris N/A — Material to be removed from the site, consisting of old treated timbers
- Excess Soil N/A — Soil that needs to be removed or relocated due to the collapsed wall