Skip to main content

Backfill with Drainage Rock and Native Soil

11:07
12:39
49.7K views

At 11:07 in

Rebuilding a Collapsed retaining wall 4K

What happens here

After the first course of blocks is laid, 3/4 clear angular rock is poured behind the wall to provide essential drainage. This prevents water buildup which could otherwise compromise the wall's stability. The drainage rock typically extends up to about 4-6 inches below the top of the retaining wall. The remaining 4-6 inches are then filled with native soil, allowing for future planting of grass or other vegetation, seamlessly blending the wall into the landscape.

Goal: The area behind the retaining wall is backfilled with 3/4 clear rock for drainage, followed by a layer of native soil at the top for landscaping purposes.

Tools and materials

  • Rakes — Spreading and leveling soil
  • Shovels — Spreading and leveling rock and soil
  • 3/4 Clear Angular Rock
  • Native Soil

What they say

Hide

foreign [Music] so if a video like this helps you out you know what helps me out there's a comment a like or a share that goes a long way and you know what else I would love to hear from you guys is what kind of videos do you want to see down the road you want to see more how-to's like this more job site videos more product reviews trade shows or a mixture of all of them let me know in the comments below but that's it for this one God bless you guys go get them and I hope you enjoy your day foreign [Music]

Auto-generated from the video audio.