What happens here
Proceed to the basement where the existing electrical panel and 200 AMP disconnect are located. Use a Milwaukee impact driver to unscrew and open the cover of the existing 200 AMP disconnect box. The video also shows a new service entrance cable being routed through the ceiling, indicating preparation for its installation.
Goal: Gain access to the existing electrical disconnect and prepare the path for the new service cable.
Tools and materials
- Milwaukee Impact Driver Milwaukee — Unscrewing the cover of the disconnect box and securing other components
- New Service Entrance Cable — Replacing the existing main power cable from the meter to the disconnect