Define Project Requirements
0:00
1:09
85.6K views
At 0:00 in
POV: An Electrician Family Trying to figure out a Plan + Price for a 100 AMP Line 100 FT, Thoughts?
What happens here
The master electrician father introduces the project to his apprentice sons: to run a new 100 AMP electrical line to a mobile office. They identify the existing power source as an outdoor 400 AMP main panel, specifically a Square D QO panel, and the destination as a 100 AMP subpanel on the mobile office. The objective is to determine the best method for this specific installation.
Goal: Clarify the electrical installation task and its context.
Tools and materials
- 100 AMP Subpanel — The destination for the new electrical line on the mobile office
- Mobile Office United Rentals — The structure receiving the new electrical service
- Outdoor 400 AMP Main Panel Square D QO — The existing source of electrical power for the new line
What they say
(638 characters)Hide
What they say
(638 characters)Auto-generated from the video audio.