Skip to main content

Initial Concrete Placement and Mesh Lifting

0:00
18:41
44K views

At 0:00 in

Pouring Concrete with Victory Outdoor Services #2

What happens here

The initial step involves placing wet concrete onto the prepared base, which includes a wire mesh reinforcement. Workers use rakes and shovels to roughly spread the concrete. Critically, during this stage, the wire mesh needs to be pulled up from the base so it's embedded within the concrete slab, providing structural integrity. If the wire mesh remains at the bottom, it will not prevent cracking effectively.

Goal: Distribute concrete evenly and properly position the wire mesh.

Tools and materials

  • Boots — Protecting feet from wet concrete and potential hazards
  • Gloves — Protecting hands from concrete and tools
  • Rakes — Spreading and distributing concrete evenly across the surface
  • Shovels — Moving and spreading concrete from piles
  • Wire Mesh — Providing structural reinforcement to prevent cracking in the concrete slab
  • Wire Pullers — Lifting the wire mesh into the center of the concrete slab during placement
  • Concrete — The main material for the patio slab

What they say

Hide

this is the most important part right here yeah and it's also the hardest job very physical hole in the wire mount it is yeah right that's why i do it darryl always tends towards the most difficult job right there that's right i get right in there i'm not afraid you wanna put your boots on i will i will right there for you thank you sir [Music]

Auto-generated from the video audio.