Reinforcement and Crack Management

5:00
17:30
89.3K views

At 5:00 in

Pouring a Concrete Patio with Victory Outdoor services!! #1

What happens here

Ryan details the foundational elements for a durable patio, including a 6-8 inch gravel base (exceeding the typical 3-inch minimum) and a 4-inch thick concrete slab for pedestrian traffic (5 inches for vehicle traffic). He emphasizes the incorporation of 10-gauge, 6x6 wire mesh reinforcement, which is pulled up into the center of the slab during the pour to enhance tensile strength and prevent the concrete from pulling apart. The strategic placement of control joints, cut to 25% of the slab's thickness, is highlighted as a critical maintenance practice to direct where cracks will occur, ensuring they remain hidden and do not compromise the patio's appearance or structural integrity.

Goal: Ensure structural integrity and prevent visible cracking in the patio

Tools and materials

  • 10-Gauge — Reinforcing the concrete slab to provide tensile strength and minimize random cracking
  • Custom Score Tool — Creating control joints in the concrete to direct cracking
  • Concrete — The primary material for the patio slab
  • Gravel — Creating a stable and well-drained base for the concrete patio

What they say

Hide

hot just like us the concrete dries out fast especially if you get that sun beating on it the sun is not your friend can't you put an additive in it to extend the working time so the problem with uh they're called retarders and it delays the set time of the concrete however it also if you go too crazy with it it also it it's hard to finish it becomes sticky and gooey so you can't really win with the stuff you can get a little bit of extra time if you put just a little bit in it but if you put too much it starts to get really difficult to work with so you're kind of stuck with what you got typically what I do when it's super hot is I'll pour early in the morning try not to do an afternoon pour because that's where you can get in a lot of trouble in the afternoon how thick of a base do you guys usually there's about six to eight inches of gravel normally that's not what we do typically it's three inches minimum so we'll dig it out three inches of gravel and then patios walks and anything that's just pedestrian traffic it's four inches thick anything that gets driven on is five inches thick so your driveways garage floors parking pads all that and then if it gets commercial traffic that depends you know you can go six inches for Light commercial eight inches for heavy commercial where it's going to get semis and stuff and then you add more reinforcement this one has a wire mesh 10 gauge wire mesh six by six squares and we pull that up as we pour the concrete so that our mesh is actually suspended in the center of the slab concrete on its own without steel reinforcement has very little tensile strength you're pulling apart strength it doesn't hold together very well it cracks and pulls apart and the wire mesh adds that tensile strength so is that why they call it crack Creek crackery yeah all concrete cracks that's what they say all concrete cracks yup I mean that's really the purpose of all these control joints the scores cuts that I'm putting in the score cut is to give the concrete a place to crack on the bottom of the score where it's not visible on the surface of the concrete so it's hiding all the cracks all concrete cracks everywhere but you're hiding the cracks with the scores that's the whole purpose it's like a sheet of glass that you score and you break it and it cracks right in the score line it's the same idea same principle with concrete that's the best I've ever heard it explained to me I've always known that you know the control joints are to…