Skip to main content

Install Upper Stone Veneer Panels

0:25
0:48
3.9K views

At 0:25 in

Perfect accent for the backside of this wall, and it went up in about two hours!!

What happens here

As the stone veneer installation progresses upwards, transition from using a ladder to setting up scaffolding to safely reach and work on the higher sections of the wall. Continue applying adhesive and/or mechanical fasteners to each panel, ensuring proper placement and interlocking. Cut panels as needed using a wet saw or angle grinder with a diamond blade (not shown, but typically required) to fit around the top edge or any obstructions, maintaining a consistent pattern. Work carefully to create tight, seamless joints between panels until the entire wall surface is covered.

Goal: Continue installing stone veneer panels to the top of the wall, using scaffolding for safe access to higher areas.

Tools and materials

  • Construction Adhesive
  • Ladder
  • Measuring Tape
  • Safety Glasses
  • Scaffolding
  • Stone Veneer Panels
  • Wet Saw / Angle Grinder