Compact Base and Fill Joints
At 2:55 in
Pavers- mastering the basics #2 START to FINISH.
What happens here
Utilize a plate compactor to thoroughly compact the Class 5 aggregate base layer in unfinished sections. This ensures a stable and level foundation. For newly laid paver sections, use the plate compactor directly on the pavers to settle them into the sand bed and achieve a uniform surface. After compaction, sweep the screed sand (or polymeric sand, if preferred, though the video prefers regular sand for freeze-thaw resilience) into the paver joints. This fills the gaps, locking the pavers together and creating a durable surface. For large open areas, sand may be spread with the Bobcat and then swept.
Goal: Before final paver cuts, the base layer (Class 5 aggregate) is compacted thoroughly. Afterwards, sand is applied and compacted into the joints of the laid pavers to lock them in place.
Tools and materials
- Broom (Push Broom)
- Plate Compactor
- Screed Sand (or Polymeric Sand)
What they say
(562 characters)Hide
What they say
(562 characters)Auto-generated from the video audio.