Dig Footing Trench
0:27
1:01
17K views
At 0:27 in
PART 1: How to build a 2-tier retaining wall. #hardscape #retainingwall #howto
What happens here
The first physical step in constructing the retaining wall is to dig a footing trench at the bottom of the sloped area. This involves excavating the soil to create a stable and level foundation. The depth and width of this trench are critical for the wall's overall stability and load-bearing capacity. For a large project involving a 'massive hill,' an excavator might be necessary, though a shovel could be used for smaller footings.
Goal: Create a properly sized and level trench for the retaining wall's base.
Tools and materials
- Excavator — Efficiently digging large or long footing trenches, especially for 'massive hills'
- Level — Ensuring the bottom of the trench is level
- Measuring Tape — Checking the depth and width of the trench
- Shovel — Excavating the soil for the footing trench