Old Deck Demolition
0:00
0:43
8.7K views
At 0:00 in
Out with the old, in with the new Prowood TrueFrame Joists!!
What happens here
The project begins with the systematic demolition of the existing wooden deck. Workers use pry bars to carefully separate and remove the old deck boards, followed by dismantling the underlying wooden frame. All removed materials are gathered and cleared from the site to prepare for the new construction.
Goal: Clear the area by removing the existing deck structure
Tools and materials
- Hammer — Removing nails and assisting with demolition
- Pry Bar — Separating and lifting deck boards and framing
- Safety Glasses — Protecting eyes from flying debris
- Steel-Toed Boots — Protecting feet from falling objects
- Work Gloves — Protecting hands from splinters and sharp objects
- Old Deck Boards — The wood removed from the old deck
- Old Deck Framing — The structural lumber removed