Skip to main content

Deck Frame Assembly

0:17
0:43
8.7K views

At 0:17 in

Out with the old, in with the new Prowood TrueFrame Joists!!

What happens here

With the foundation in place, the construction of the new deck frame begins. This step involves carefully cutting and securing pressure-treated lumber to create the ledger board (attached to the house), support beams, and a dense network of joists. The joists are typically spaced according to local building codes (e.g., 16 inches on center) to provide adequate support for the future deck boards. Workers measure, cut, and fasten the lumber using various carpentry tools, progressively building out the skeletal structure of the deck.

Goal: Construct the structural frame, including beams and joists, for the new deck

Tools and materials

  • Circular Saw — Cutting lumber to length
  • Drill — Pre-drilling holes and driving screws
  • Framing Square — Ensuring right angles
  • Hammer — Driving nails and adjusting components
  • Impact Driver — Efficiently driving screws into lumber
  • Miter Saw — Making precise angle cuts for joists and beams
  • Pencil/Marker — Marking cuts and measurements
  • Spirit Level — Ensuring the frame is level and plumb
  • Tape Measure — Measuring dimensions for cuts and spacing
  • Joist Hangers — Metal connectors to support joists from beams
  • Nails — Securing wood components
  • Pressure-Treated Lumber — Main support members spanning between posts/piles
  • Structural Screws — Fastening lumber components

What they say

Hide

[music] >> Woo! >> Hey! >> [music]

Auto-generated from the video audio.