Skip to main content

Placing Main Waterfall Boulders

16:30
27:39
16.8K views

At 16:30 in

Our First Waterfall! 4K

What happens here

Large boulders are carefully selected and placed using the excavator to form the main structure of the waterfall and its various tiers. The team emphasizes testing each rock for stability before releasing it from the excavator. Water is briefly run through the system to observe the flow and identify any adjustments needed. The placement of these primary rocks dictates the shape and sound of the waterfall. Smaller rocks are then used to fill gaps and enhance the natural aesthetic.

Goal: Construct the primary structure of the waterfall using large boulders

Tools and materials

  • Excavator Daewoo — Lifting and precisely placing large boulders for the waterfall structure
  • Large Boulders — Forming the main structure and tiers of the waterfall
  • Shovels — Adjusting smaller rocks and fill material around the boulders
  • Water N/A — Testing the waterfall's flow during construction

What they say

Hide

right there on the corner off right there that's that's behind everything but that's way higher than water bottle I'm not gonna start with this one set it down gently can you see a little shim like people [Music] okay nice and slow movements man nothing here yeah no jerky slow is smooth smooth is fast [Music] then kickstand like I need a thin lock again yeah foreign [Music] thank you [Music]

Auto-generated from the video audio.