Initial Excavation and Grading
2:00
27:39
16.8K views
At 2:00 in
Our First Waterfall! 4K
What happens here
Utilize an excavator (specifically a Daewoo 75V mini-excavator with a CMP Attachment hydraulic grapple) and a skid steer (Kubota SVL75-2) for the initial excavation phase. Dig a large, irregularly shaped basin for the main pond area and a trench leading up the slope for the waterfall cascade. Workers manually assist with shovels to shape the edges and level specific areas according to the design plan. Ensure proper elevation changes are established for gravity-fed water flow.
Goal: Excavate the main pond basin and waterfall trench to design specifications.
Tools and materials
- Excavator Daewoo 75V — Large-scale digging and earthmoving
- Hydraulic Grapple CMP Attachment — Attachment for the excavator to move rocks and debris
- Level — Ensuring precise grading and leveling
- Leveling Pole/Stick — Checking depths and elevations
- Rake — Smoothing out soil and grading
- Shovel — Manual shaping, leveling, and fine-tuning excavated areas
- Skid Steer Kubota SVL75-2 — Moving excavated dirt and gravel