Resume Retaining Wall Construction
At 8:51 in
Nope-Back to Losing money on this Job....
What happens here
Following the successful hydraulic repair, the team gets back to the primary task of constructing the retaining wall. This involves continued laying of concrete blocks, backfilling layers of gravel and good soil (while carefully separating frozen or unsuitable soil), and compacting each layer with plate compactors and the excavator. The process includes cutting custom blocks for corners and drain tile placement, laying geogrid for structural reinforcement, and continually battling the muddy, freezing, and thawing conditions characteristic of winter construction. The video concludes with the finished retaining wall and blanketed slopes, highlighting the perseverance through numerous on-site challenges.
Goal: With the backhoe's hydraulic system repaired and operational, the crew resumes the challenging work of building the retaining wall, continuing with block placement, backfilling, and soil compaction.
Tools and materials
- Block Chisel
- Circular Saw (Husqvarna K770)
- Excavator (Daewoo)
- Measuring Tape
- Plate Compactor (Tomahawk
- Wacker)
- Rubber Mallet
- Shovels and Rakes
- Skid Steer Loader (Volvo)
- Speed Square
- Concrete Retaining Wall Blocks
- Drain Tile (Corrugated Pipe)
- Geogrid
- Gravel
- Pins/Screws
- Straw Blankets
What they say
(2,499 characters)Hide
What they say
(2,499 characters)Auto-generated from the video audio.