Material Preparation and Initial Wall Laying
1:14
19:36
148.4K views
At 1:14 in
Nope-Back to Losing money on this Job....
What happens here
A worker is shown using a large cut-off saw, specifically a Husqvarna K770, to precisely cut concrete blocks. The blocks are cut to create specific dimensions needed for the retaining wall structure. This process demonstrates the need for accurate measurements and careful handling of materials even in challenging weather conditions, which often adds to the complexity and time required for such tasks.
Goal: This step involves preparing concrete blocks by cutting them to size and beginning the initial courses of the retaining wall.
Tools and materials
- Concrete Blocks
- Husqvarna K770 Cut-Off Saw
- Tape Measure
What they say