Acknowledge Winter Construction Challenges
At 0:00 in
Nope-Back to Losing money on this Job....
What happens here
Workers are seen using tools such as chisels and torches (like a large propane torch from a tank) to clear ice from concrete blocks and warm up the work area. The ground is muddy and partially frozen, indicating challenging conditions for operating heavy machinery. The initial efforts are focused on preparing the materials and the worksite to enable block laying and ground compaction. The discussion highlights issues like starting machines in cold temperatures and the slow progress due to needing to remove ice and frozen elements from the blocks and ground. The overall context emphasizes how these strenuous conditions can lead to equipment malfunctions.
Goal: The video opens by showcasing the harsh winter environment and the difficulties encountered during the construction of a retaining wall. This includes frozen ground, ice-covered concrete blocks, and the need for specialized tools like torches and heavy machinery to prepare the site, which puts significant strain on equipment.
Tools and materials
- Block Chisel
- Chisel
- Circular Saw (Husqvarna K770)
- Excavator (Daewoo)
- Large Propane Torch
- Measuring Tape
- Plate Compactor (Tomahawk
- Wacker)
- Rubber Mallet
- Shovels and Rakes
- Concrete Retaining Wall Blocks
- Drain Tile (Corrugated Pipe)
- Geogrid
- Gravel
- Pins/Screws