Site Grading and Material Disposal
5:18
13:29
64.9K views
At 5:18 in
No Room to work ???
What happens here
Once the majority of the soil is removed, the mini-loader works on grading the excavated area. The operator skillfully uses the bucket to smooth and shape the terrain, preparing it for the installation of the drainage swale. Following this, the loaded dump truck departs the job site and travels to a material disposal facility. The truck raises its bed using its air suspension system to increase clearance, and the material is safely dumped.
Goal: After clearing, the skid steer is used to refine the grading of the excavated area, shaping it according to the drainage plan. The dump truck then transports the loaded material to a designated disposal site.
Tools and materials
- Cast Loaders Carbon 33T Mini-Loader
- Dump Truck
What they say
(482 characters)Hide
What they say
(482 characters)Auto-generated from the video audio.