Skip to main content

Final Grading and Site Shaping

5:19
13:29
64.9K views

At 5:19 in

No Room to work ???

What happens here

After removing the bulk of the soil, the mini loader is used to fine-grade the area, shaping it to create the desired drainage swale and ensure proper water runoff. The operator emphasizes the importance of precise grading skills. Any debris or spills on the sidewalk from the loading process are cleaned up using the mini loader's bucket.

Goal: Precisely grade the cleared area to direct water flow and prepare for erosion control and seeding.

What they say

Hide

down and keep working yeah but that is that water is that hydraulic i don't know yeah water this came from up north and we had just got snow yesterday so there's got to be snow inside of it and it's not used to warm temps so [Music] so i've been practicing my grading in this and i've got a job coming up where i think i not this job but i think i finally got the grading in this mini loader nailed nailed

Auto-generated from the video audio.