Patio Base Preparation and Compaction
12:40
17:21
6.6K views
At 12:40 in
"No Plan, No Problem" Landscape
What happens here
After the retaining wall is complete, the area for the patio is prepared. The existing soil is leveled and compacted to create a stable sub-base. A layer of crushed stone or gravel is spread over the sub-base and meticulously leveled using screed rails (metal pipes). The entire area is then compacted using a plate compactor to create a solid, even foundation for the pavers. This process ensures proper drainage and prevents future settling of the patio.
Goal: Create a stable and level sub-base and base layer for the patio.
Tools and materials
- Gravel Base Material — Creating the stable base layer for the patio
- Level — Checking the evenness of the base
- Plate Compactor — Compacting the gravel base layer
- Rakes — Spreading and rough leveling of base materials
- Screed Rails — Guiding the leveling process for the base layer
- Shovels — Spreading and adjusting base materials
- Skid Steer ASV — Moving and spreading base materials