Skip to main content

Site Survey and Preparation

0:00
0:29
1.3M views

At 0:00 in

NO MORE CONCRETE! #building #construction

What happens here

The video implicitly begins by highlighting an alternative to concrete deck footings: helical piles. Before actual installation can begin, the site for the new deck or structure should be thoroughly surveyed and marked. This critical step involves accurately laying out the locations for each helical pile according to engineering plans and local building codes. While not explicitly shown in the video, the red lines visible on the ground imply that this crucial site preparation and marking has already occurred.

Goal: Prepare the construction site and mark precise locations for helical pile installation.

Tools and materials

  • Site Plans/Blueprints — Guiding the precise layout and positioning of the helical piles according to structural engineering
  • Spray Paint — Creating visible ground markings for pile layout, as seen by the red lines in the video
  • Survey Stakes/Flags — Physically marking the precise locations where each helical pile will be installed
  • Tape Measure — Taking accurate measurements for pile placement