Route MC Cables Under the Floor
2:42
2:51
444.6K views
At 2:42 in
My Dad (Master Electrician) shows the Electric inside a Data Center, and it’s wired, Thoughts?
What happens here
With the plenum accessible, the electrician and a helper begin the task of running the six 10/4 MC cables. Each cable is fed from its designated RPP panel, guided through the underfloor plenum, and routed towards the locations of the three new server racks. This process requires careful planning to ensure proper length, avoid interference with cooling airflow, and maintain organized cable pathways.
Goal: Run the plenum-rated MC cables from the RPP to the new server rack locations.
Tools and materials
- 10/4 MC Cable — The primary electrical wiring for the new racks
- Safety Vest — Ensuring visibility and safety in a working environment
What they say
(161 characters)Hide
What they say
(161 characters)Auto-generated from the video audio.