What happens here

With the plenum accessible, the electrician and a helper begin the task of running the six 10/4 MC cables. Each cable is fed from its designated RPP panel, guided through the underfloor plenum, and routed towards the locations of the three new server racks. This process requires careful planning to ensure proper length, avoid interference with cooling airflow, and maintain organized cable pathways.

Goal: Run the plenum-rated MC cables from the RPP to the new server rack locations.

Tools and materials

  • 10/4 MC Cable — The primary electrical wiring for the new racks
  • Safety Vest — Ensuring visibility and safety in a working environment

What they say

Hide

EMT, MC cable. No rubber cord, SO cord, SJ cord is not plenum rated. All right, let's get to work. Let's get to it. Okay. I'll start getting the wire. All right.