The current service call involves installing power for three new network racks. Each rack requires two individual power feeds. This means a total of six cables will be run. Each cable needs to terminate with a specific 5-pin, 32-amp IEC pin and sleeve connector. These cables will be connected to 3-pole breakers within the RPP and run underneath the raised floor to the new rack locations.

Goal: Identify the power requirements and cabling specifications for new server racks.

Tools and materials

  • 3-Pole Breaker — Providing circuit protection for each power feed
  • 5-Pin — Connecting the power cable to the server rack's power supply unit
  • 10/4 MC Cable — Providing power from the RPP to the server racks; it is plenum-rated for underfloor use

What they say

Hide

call today? We're going to install three more new racks right here. One, two, three. They need a specific five-pin 32-amp IBC connector. It's a pin and sleeve connector. Cuz we're going to put it on a three-pole breaker, MC cable under the floor and to these disconnectors. So when the IT guys install the network cabinet, they can connect into it. So we need to put in six 10 4 wire, two, two, and two and we need to come from this series of panels here. So this drop down