Skip to main content

Access Underfloor Plenum and Observe Cabling

2:19
2:51
444.6K views

At 2:19 in

My Dad (Master Electrician) shows the Electric inside a Data Center, and it’s wired, Thoughts?

What happens here

To run the cables, access to the underfloor plenum is required. The electrician demonstrates using a suction cup floor remover to lift the raised floor tiles. This reveals the underfloor area, which in a data center is often a 'plenum' space used for air circulation and cable management. It's crucial to use plenum-rated MC (Metal Clad) cable in this space, as specified by codes, to prevent the spread of fire and toxic fumes in case of a fire.

Goal: Gain access to the underfloor plenum for cable routing and understand plenum cable requirements.

Tools and materials

  • Suction Cup Floor Remover — Safely lifting and removing raised floor tiles

What they say

Hide

panels here. So this drop down and we Okay. So we got to get a wire down there. If you notice it's all MC because it's plenum rated. Right? Can't use Romex. You could use EMT, MC cable. No rubber cord, SO cord, SJ cord is not plenum rated. All right, let's get to work. Let's get to it.

Auto-generated from the video audio.