Install I-Beams Across Creek
At 8:32 in
MECHANIC ADVICE NEEDED....BUILDING AN ATV/UTV BRIDGE...AND MORE!
What happens here
The truck is backed up to the edge of the creek where the bridge is planned. The ratchet strap is released, and the I-beams are carefully slid out of the truck bed one by one. Each beam is then manually carried and aligned across the narrowest point of the creek, resting firmly on both banks. This step involves precise placement to ensure stability and sufficient spacing between the beams for future decking, creating a robust, albeit basic, pathway across the water. Note: The video demonstrates a direct placement of the beams onto the earth banks of the creek, without the use of joist hangers or elaborate foundation structures, which is a departure from typical pergola/gazebo construction methods.
Goal: Upon arrival at the creek, the secured metal I-beams are unloaded from the truck and strategically positioned to span the creek, forming the foundational structure of the new footbridge.
Tools and materials
- Work gloves
What they say
(2,270 characters)Hide
What they say
(2,270 characters)Auto-generated from the video audio.