Mount Meter/Disconnect Combo Box and Wire
At 5:08 in
MASTER ELECTRICIAN DAD TEACHES HIS SON A 200 AMP SERVICE!
What happens here
This crucial step involves installing the new meter/disconnect combo box on the exterior wall. The conduit containing the service cable is fed into the top of the meter box. Marks are made on the wall where new holes need to be drilled for mounting the box and for routing the ground wire. A hole saw is used to create a new hole for the ground wire conduit. The meter box is then securely mounted to the wall, and the service cable is further routed within the box. Before making final connections, the neutral conductor is once again unwound and prepared. The insulated hot wires are then secured to the appropriate lugs, and an anti-oxidant compound (No-Ox-Id) is applied to prevent corrosion.
Goal: Install the new 200 Amp meter/disconnect combo box and prepare internal wiring.
Tools and materials
- 4/0 AL Service Cable — Main service conductors
- Cordless Drill Milwaukee M18 Fuel — Drilling mounting holes and for the ground wire conduit
- Hole Saw — Creating entry holes for conduit
- Meter/Disconnect Combo Box Eaton — Main service entrance and overcurrent protection for the building
- Screwdriver — Marking and general tightening
- Anti-Oxidant Compound No-Ox-Id — Preventing corrosion on aluminum wire connections