Quantify Lost Time Due to Unforeseen Events

2:04
15:10
66.4K views

At 2:04 in

Lost $14,500 on this Jobsite 4/4

What happens here

The project faces significant challenges, including a machine breakdown and several soil corrections. The first soil correction alone takes 2-3 days to devise and get approved, causing non-productive time. Subsequent snow and rain events further halt progress. Blaine highlights that while some unforeseen circumstances like soil corrections can be billed as change orders, delays caused by such events or equipment failures (e.g., Volvo machine breakdown, which temporarily halted work before an ASV skid steer could be brought in) result in unbillable lost time. These non-billable periods, combined with fixed daily overhead costs (estimated at $1000/day for the company covering insurance, rent, etc.), accumulate to substantial financial losses. Up to this point in the project, approximately 14.5 days of operational time are lost due to these compounding issues.

Goal: Document and quantify time lost due to unexpected issues such as equipment breakdowns, adverse weather conditions, and multiple soil corrections. Distinguish between project changes that are billable (change orders) and those that incur unrecoverable overhead costs.

Tools and materials

  • ASV Skid Steer
  • Caulk Gun with Adhesive
  • Excavator (Daewoo)
  • Power Broom / Sweeper (Wacker)
  • Propane Torch
  • Safety Helmet
  • Spirit Level
  • Work Gloves
  • Strong Adhesive (VERSABOND) VERSABOND

What they say

Hide

do you think that's possible nope so here you go i'm gonna make my own lmn banner this is my lmn banner let's put the word banner up [Music] there you go all right so next step we got another chorus line up here this next course is going to be a grid layer so we're going to backfill it and lay the grid back and stack another course we got the one cut here for our inside 90. let me tell you what i do not like these inside 90s because here's why you have a cut side going up against a rough side and there's like no way you can get that to not have a little bit of a gap it's a very tiny gap he's talking about so you got a rough surface and you got a smooth surface and so this is just literally the difference between a smooth surface and a rough surface okay so i wanted to break down where we lost money on this project we had verified change orders so the unforeseen circumstances that happened we could charge for that where we lost money was in our overhead and this is where a lot of guys start to not really calculate that into the overall cost of a project but for our company on average we have about a thousand dollars in overhead per day that means that whether we work or don't work it costs us a thousand dollars just to wake up in the morning and do absolutely nothing that's insurance that's all of the you know overhead uh building expense rent upkeep things that no matter what happens hitch is an expense and so in the beginning of this job we had a breakdown we lost time there then we had a soil correction which we got to charge for but we had tim and i had to figure out how to do the soil correction then we had to talk to engineers and while we were doing all of that we were still losing time we were losing lost hours the guys were still working but they weren't working full throttle they were working part throttle because we didn't know if we were veering left and doing a soil correction like this or veering right and doing a soil correction like that so while production slowed down our overhead costs just continued to go no i'm going heavy on the glue i'm doing that on purpose though because there are a lot of kids in this complex and you know they're going to be climbing all over this wall when we're yeah i done the fact that he takes that into consideration the kids like to climb on top of the blocks and without a good amount of glue on it those blocks can separate all right guys so on the corners there's two different types the inside 90 degree and…

Auto-generated from the video audio.