Analyzing Project Overheads & Lost Time (Waste Audit Execution)

1:02
15:10
66.4K views

At 1:02 in

Lost $14,500 on this Jobsite 4/4

What happens here

While construction continues, Blaine provides a direct 'waste audit' of the project's financial performance. He explicitly states that where they lost money was in 'overhead', which many contractors fail to accurately calculate. He defines overhead as daily fixed costs (e.g., insurance, rent, building expenses) that accrue whether work is performed or not, equating to a significant amount (e.g., $1000/day). He distinguishes between 'verified change orders' (billable for unforeseen circumstances) and 'lost time' due to issues like equipment breakdowns, soil corrections (requiring engineering consultation and delaying work), and adverse weather (snow, rain). This 'lost time' is non-billable to the customer and represents a direct financial waste, highlighting the importance of data collection (tracking delays, identifying root causes) and analysis (quantifying financial impact) for effective waste management planning.

Goal: This crucial step involves an in-depth financial analysis of project overheads and lost time, demonstrating a practical waste audit. The commentator, Blaine, outlines how unexpected events and inefficiencies translate into unrecoverable costs for the business.

Tools and materials

  • Project Cost Reports
  • Project Schedule/Log

What they say

Hide

and we're gonna answer all of those questions today but there's something i gotta do [Music] this stays up this stays up [Music] sucks how's that look to you guys does that look like an l m n because i've asked lmn they they actually help support this show so i asked him can you send me a banner because i want to put it up on the wall behind me do you think i could get a banner do you think that's possible nope so here you go i'm gonna make my own lmn banner this is my lmn banner let's put the word banner up [Music] there you go all right so next step we got another chorus line up here this next course is going to be a grid layer so we're going to backfill it and lay the grid back and stack another course we got the one cut here for our inside 90. let me tell you what i do not like these inside 90s because here's why you have a cut side going up against a rough side and there's like no way you can get that to not have a little bit of a gap it's a very tiny gap he's talking about so you got a rough surface and you got a smooth surface and so this is just literally the difference between a smooth surface and a rough surface okay so i wanted to break down where we lost money on this project we had verified change orders so the unforeseen circumstances that happened we could charge for that where we lost money was in our overhead and this is where a lot of guys start to not really calculate that into the overall cost of a project but for our company on average we have about a thousand dollars in overhead per day that means that whether we work or don't work it costs us a thousand dollars just to wake up in the morning and do absolutely nothing that's insurance that's all of the you know overhead uh building expense rent upkeep things that no matter what happens hitch is an expense and so in the beginning of this job we had a breakdown we lost time there then we had a soil correction which we got to charge for but we had tim and i had to figure out how to do the soil correction then we had to talk to engineers and while we were doing all of that we were still losing time we were losing lost hours the guys were still working but they weren't working full throttle they were working part throttle because we didn't know if we were veering left and doing a soil correction like this or veering right and doing a soil correction like that so while production slowed down our overhead costs just continued to go no i'm going heavy

Auto-generated from the video audio.