Drainage System Improvement & Final Grading

6:12
15:10
66.4K views

At 6:12 in

Lost $14,500 on this Jobsite 4/4

What happens here

The team addresses a significant water management issue by excavating and removing old, clogged drain tiles, which are shown to be completely ineffective due to accumulated debris. These are replaced with new, solid, non-perforated drain pipes to prevent future clogging and ensure efficient water flow. This new system is connected to the existing drainage network as part of the overall soil correction strategy, managing water away from the retaining wall. Following this, the site undergoes final grading with black dirt, ensuring proper pitching towards the parking lot where drains are located. This eliminates previous 'swamp-like' conditions, significantly improving environmental performance and preventing water-related structural issues. This exemplifies proactive waste management in terms of preventing water damage and associated material replacement.

Goal: This step showcases the critical upgrade of the site's drainage system by replacing old, ineffective drain tiles with new solid pipes. It also includes the final grading of the area to ensure proper water runoff and site stability.

Tools and materials

  • Compactor
  • Mini Excavator
  • Shovels
  • Skid Steer Loader
  • Black Dirt
  • Solid Drain Pipe

What they say

Hide

this job at a thousand dollars per day our first breakdown we didn't lose a full day of work we were able to pull this asv in to save the day then we discovered our first of four soil corrections the first one took us the longest between two and three days to really come up with a solution and to get that solution approved and we can't expense the lost time because we can't expense our overhead toward the project if we're not actually working at least that's not the way we operate okay we can expense the change in the project but not the lost time and so we lost days there on the first soil correction then we had snow turned to rain we lost more days there uh about three more days so we have a lo total about six and a half days all right guys we are calling it a night we're pretty much out of daylight so here's what we got done we got this area all dialed in it's graded out everything's pitching down that way towards the parking lot because if you guys remember of this whole area was just a swamp or was nowhere for the water to go it's just sitting in here and getting nasty so now it's all heading towards the parking lot where they got drains and all that stuff uh and what else i'm 90 of the way down with the caps i just have to cut a couple for this little radius and then way over there at the corner there's a little radius you need to cut like two blocks so we'll do that right away in the morning on monday what else uh we started getting everything top dressed so this side is all good to go the other side going up the slope is all good to go we just have this little area to kind of fill in a little more in the top dress for the slope right up there so we'll do that on monday too uh what else oh yeah they want us to seed all of this so we're gonna get that all get the rest of black dirt down seed it and then we're going to put some straw mat down that sucker's froze down holy sam is smiling but the birds and mice need food too right and whatever doesn't get turned into crater chow will grow in the spring so back to how much money we lost up to about the second soil correction we had lost six and a half days at a thousand dollars per day so about 6 500 bucks up to that point then we had the volvo breakdown then we discovered a third soil correction and then we discovered a fourth soil correction and then we had another snowstorm come in and then it warmed up again so it was back and forth see-saw see-saw see-saw and all of those see-saws cost us around 14…

Auto-generated from the video audio.