Drainage System Improvement & Final Grading
At 6:12 in
Lost $14,500 on this Jobsite 4/4
What happens here
The team addresses a significant water management issue by excavating and removing old, clogged drain tiles, which are shown to be completely ineffective due to accumulated debris. These are replaced with new, solid, non-perforated drain pipes to prevent future clogging and ensure efficient water flow. This new system is connected to the existing drainage network as part of the overall soil correction strategy, managing water away from the retaining wall. Following this, the site undergoes final grading with black dirt, ensuring proper pitching towards the parking lot where drains are located. This eliminates previous 'swamp-like' conditions, significantly improving environmental performance and preventing water-related structural issues. This exemplifies proactive waste management in terms of preventing water damage and associated material replacement.
Goal: This step showcases the critical upgrade of the site's drainage system by replacing old, ineffective drain tiles with new solid pipes. It also includes the final grading of the area to ensure proper water runoff and site stability.
Tools and materials
- Compactor
- Mini Excavator
- Shovels
- Skid Steer Loader
- Black Dirt
- Solid Drain Pipe
What they say
(2,500 characters)Hide
What they say
(2,500 characters)Auto-generated from the video audio.