Perform Equipment Maintenance and Demobilization
13:54
15:44
13.5K views
At 13:54 in
Landscape Construction Time lapse: grading, walls & dry creek bed
What happens here
The project concludes with essential equipment maintenance and demobilization. The excavator's tracks are thoroughly cleaned using a shovel to remove accumulated dirt and debris, ensuring proper operation and longevity. Afterward, the excavator is carefully loaded onto a flatbed trailer, preparing it for transport off the site.
Goal: Excavator tracks are cleaned, and the machine is then loaded onto a flatbed trailer for demobilization, concluding the project.
Tools and materials
- Excavator — The heavy machinery being maintained and transported
- Flatbed Trailer — Transporting the excavator off the site
- Grease Gun — Performing routine maintenance on excavator grapple attachments
- Shovel — Cleaning dirt and debris from excavator tracks
- Grease