Building Upper Layers of the Wall
0:43
15:44
13.5K views
At 0:43 in
Landscape Construction Time lapse: grading, walls & dry creek bed
What happens here
The excavator continues to build up the retaining wall by meticulously placing more large stones on top of the established foundation. The operator skillfully manipulates the grapple to position each rock, stacking them to create a robust and visually appealing wall. Workers on the ground assist with manual adjustments and ensure the rocks fit snugly.
Goal: Construct the main body of the retaining wall with stacked stones.
Tools and materials
- Excavator Doosan — Placing stones for the wall
- Grapple Attachment CMP Attachments — Handling and positioning the stones
- Hand Tools — Manual adjustments of stones
- Large Boulders Natural stone — The building material for the wall