Skip to main content

Compact and Level Ground Surfaces

0:16
15:44
13.5K views

At 0:16 in

Landscape Construction Time lapse: grading, walls & dry creek bed

What happens here

Following the initial rock placement and between layers of added soil, the ground is systematically compacted to create a stable and dense base. A jumping jack compactor is used for localized compaction, while shovels and rakes are employed to spread and level loose dirt before and after compaction. This ensures proper settlement and prevents future erosion or instability.

Goal: Dirt is spread, leveled, and compacted using a jumping jack compactor to ensure a stable foundation for subsequent layers of the terracing and retaining wall.

Tools and materials

  • Dirt/Soil — Fill material for grading and leveling
  • Jumping Jack Compactor — Compacting soil and fill material to increase density and stability
  • Rake — Leveling and smoothing soil surfaces
  • Shovel — Moving and spreading dirt, preparing areas for compaction