Redesign and Implement Slope Stabilization Measures
At 4:49 in
Landscape, Construction Management Disaster turns Into a Mud/ LandSlide
What happens here
Faced with a collapsed slope and a distressed customer, the contractor agreed to stabilize the bank at cost to maintain their reputation, even though the failure was due to a customer-insisted change outside the original design. The new plan involved a comprehensive drainage and retaining system. This included installing 'chimney drains' (vertical drains) that penetrate the bank to collect and funnel water out, as well as a horizontal drainage system behind boulder retaining walls. Large, 4-foot boulders were strategically placed to support the slope.
Goal: Stabilize the failed slope with a robust drainage and retaining wall system.
Tools and materials
- Excavator Daewoo — Digging trenches for drains and placing large boulders
- Shovels N/A — Manual fine-tuning of excavation and material placement
- Skid Loader Bobcat T180 — Moving soil, rocks, and assisting with grading
- 4-Foot Boulders N/A — Constructing a retaining wall for structural stability
- Black Plastic Sheeting N/A — Temporary erosion control and protecting underlying soil
- Chimney Drains — Collecting water within the bank and funnelling it out
- Geotextile Fabric N/A — Lining trenches and separating soil from drainage rock
- Gravel N/A — Backfilling drainage trenches
- Horizontal Drainage System N/A — Directing water from behind the retaining wall