What happens here
After the initial design was planned, the team proceeded to import the specified volume of soil. Heavy machinery, including a quad axle dump truck (hauling approximately 18 tons of soil per load) and a Bobcat T180 skid-steer loader, was used to move and grade the soil. The soil was carefully distributed to create the gentle pitch off the back door and transition into the planned 20-degree slope. This phase concluded with the completion of the original project scope, achieving a visually appealing and maintainable landscape.
Goal: Complete the initial landscaping project by grading the soil to a 20-degree slope.
Tools and materials
- Bobcat T180 Skid-Steer Loader Bobcat — Moving, spreading, and grading soil
- Quad Axle Dump Truck N/A — Transporting large quantities of soil to the site
- Good Black Soil N/A — Filling and grading the slope