Skip to main content

Execute Initial Grading and Project Completion

0:56
8:43
892.1K views

At 0:56 in

Landscape, Construction Management Disaster turns Into a Mud/ LandSlide

What happens here

After the initial design was planned, the team proceeded to import the specified volume of soil. Heavy machinery, including a quad axle dump truck (hauling approximately 18 tons of soil per load) and a Bobcat T180 skid-steer loader, was used to move and grade the soil. The soil was carefully distributed to create the gentle pitch off the back door and transition into the planned 20-degree slope. This phase concluded with the completion of the original project scope, achieving a visually appealing and maintainable landscape.

Goal: Complete the initial landscaping project by grading the soil to a 20-degree slope.

Tools and materials

  • Bobcat T180 Skid-Steer Loader Bobcat — Moving, spreading, and grading soil
  • Quad Axle Dump Truck N/A — Transporting large quantities of soil to the site
  • Good Black Soil N/A — Filling and grading the slope

What they say

Hide

surface. You can mow it. You can easily establish vegetation. It's no big deal. We literally had the project done. I like the slope. So, you created a basically would you consider this a two to one, Tim? Almost. Still working on scrounging some some more dirt. Just good black soil. You've got You don't have it perfectly flat up here because we need water to run off. Of course. But, it looks good. I don't see where you need a whole lot more dirt. So,

Auto-generated from the video audio.