Assess Existing Slope and Plan Initial Grading
0:26
8:43
892.1K views
At 0:26 in
Landscape, Construction Management Disaster turns Into a Mud/ LandSlide
What happens here
The project began with an assessment of the customer's backyard, which featured a nasty, wavy slope directly behind the back door, leaving no flat yard space. The original plan involved importing approximately 300-400 cubic yards of soil to create a gentle pitch off the back door, allowing water to shed effectively. To maximize flat yard space, this initial pitch was designed to transition into a maintainable 20-degree slope, suitable for mowing and establishing vegetation without significant erosion risks.
Goal: Transform a steep, wavy slope into a gentle, maintainable 20-degree slope with proper drainage.