Practice Proper Roller Loading and Overlapping
0:36
2:50
123.4K views
At 0:36 in
Keeping A Wet Edge While Rolling A Wall. Proper Paint Rolling. How to roll a wall.
What happens here
Chris demonstrates the practical application of the wet edge. He starts painting a wall section, working from left to right, and emphasizes overlapping each new pass of the paint roller by 50% with the previously painted section. He continually dips the roller's nap into the paint, stressing the need to keep the nap saturated. If the nap runs dry, there won't be enough paint to 'gel and float together,' leading to an uneven finish. He reiterates the importance of continuous reloading.
Goal: Properly load the roller and apply paint with a 50% overlap.
Tools and materials
- Paint Roller with Extension Pole — Applying paint to the wall
- Paint — Covering the wall
What they say
(683 characters)Hide
What they say
(683 characters)Auto-generated from the video audio.