Skip to main content

Evaluate Performance & Efficiency

10:00
15:29
99.9K views

At 10:00 in

I've NEVER seen a Skid Steer Attachment Like this.

What happens here

After operating the various machines and attachments, evaluate their effectiveness. Consider the time taken to prepare a designated area (e.g., 20ft by 20ft section). Critically examine the quality of the prepared ground, noting the consistency of tilling, the removal of established roots, and the overall smoothness and readiness for seeding. The operator's experience and the machine's features (like bi-directional operation and adjustable aggression) significantly impact both time and quality. The goal is to determine which combination of equipment and technique offers the most productive and efficient outcome, providing valuable data for future operational planning and potentially influencing maintenance strategies by identifying tools that perform optimally under specific conditions.

Goal: This step involves assessing the performance of different equipment and attachments in terms of task completion time and the quality of ground preparation.

Tools and materials

  • Clipboard and Pen
  • Measuring Tape
  • Skid Steer with Tiller
  • Tractor with Tiller

What they say

Hide

to be able to do that i love it i love it is that awesome dude i know it's got a learning curve right for sure but but you were in it you were in it for about six minutes six minutes yeah and i was already finding the sweet spots i was already figuring out what to do and what not to do give me a day in it and i'll be farmer jones and this this is honestly this is some of the hardest stuff you can work with because i mean this is established roots this is not new seating this is established root systems and deep roots and hard pushing now what is jamison doing over there he's preparing our tests for for derrick and jameson and maybe you on filling those holes back in we've got the three skids or we got three three equipment we're gonna use a tractor with a three-point hydra rake and a bucket and a loader we're gonna have jameson and his t450 in the hydra bucket and then we've got a t-76 that we're going to use a bucket and and the skid steer hydra rake and we're going to take those piles that he's digging and they're going to put them back together it's a 20 foot approximately 20 foot by 20 foot one foot hole and we're gonna see who does the fastest and most efficient job of preparing that 25-20 foot square for seating for seat for for any kind of seat yep all right so we could like we would do we want to get it smooth enough that we could seat it with grassy correct that's the idea who can do it the not necessarily the quickest but i think we should probably judge time and quality time and quality because those are the two things guys they don't really care about one or the other they want both when they put their dollars bills down right i like it what are we doing i'm thinking uh i'm hoping i can win with the tractor because that's where i put my money in my mouth 10 years ago 10 years ago that's right this is where this video came from one

Auto-generated from the video audio.