Skip to main content

Prepare Excavator with Grapple

0:00
23:02
737.3K views

At 0:00 in

It was a BAD TIME for this building inspector to show up.

What happens here

Begin by connecting the hydraulic hoses to the excavator's grapple attachment. This is a crucial step for preparing the heavy machinery to begin demolition of the old retaining wall.

Goal: Attach the grapple to the excavator for demolition tasks.

Tools and materials

  • Excavator Daewoo — Operating the grapple for demolition
  • Hydraulic Hoses — Connecting the grapple to the excavator's hydraulic system
  • Wrench — Tightening hydraulic line connections

What they say

Hide

[Music] yeah our footing inspection and geogrid inspection's coming in the morning so it would sure be nice to keep being able to

Auto-generated from the video audio.