Skip to main content

Excavate Test Hole to Expose Buried Components

5:22
22:49
3.1M views

At 5:22 in

Is this Building Inspector For Real?

What happens here

The builder proceeds to dig a test hole next to the retaining wall, aiming to expose the geogrid and drainage aggregate for the inspector. He uses a post hole digger, which is suitable for penetrating the heavily compacted soil. He explicitly states that the soil is so tightly packed it feels like 'digging through concrete,' underscoring the quality of the original construction. After considerable effort, he successfully exposes a section of the geogrid and the underlying drainage aggregate, confirming their presence and proper depth without compromising the wall's structure.

Goal: Physically expose the geogrid and drainage aggregate without compromising the retaining wall.

Tools and materials

  • Compacted Soil N/A — The material being excavated
  • Drainage Aggregate — The buried drainage material to be exposed
  • Geogrid — The buried reinforcing material to be exposed
  • Post Hole Digger — Digging test holes in compacted soil
  • Tarp — Collecting excavated soil to keep the area tidy and facilitate backfilling