Prepare and Level the Class 5 Aggregate Base
At 0:33 in
Installing Brick pavers -start to finish day2
What happens here
The project begins with a prepped area that has already had its sub-base excavated and an initial layer of Class 5 aggregate laid and compacted. The primary goal of this initial step is to ensure the Class 5 base layer is at the correct elevation, 3 inches below the final string line (which represents the top of the pavers). If the base is too high, additional material needs to be removed using a skid-steer loader and shovels. If it's too low, more Class 5 aggregate must be added and then raked and leveled using a landscaping rake and shovel. The Class 5 aggregate is compacted in lifts (sections) using a plate compactor.
Goal: Achieve the correct elevation and compaction for the Class 5 aggregate base.
Tools and materials
- Hand Tamper — Fine-tuning compaction in smaller or harder-to-reach areas
- Landscaping Rake — Leveling and distributing Class 5 aggregate
- Plate Compactor Northstar — Compacting the Class 5 aggregate base in uniform lifts
- Shovel — Removing or spreading Class 5 aggregate
- Skid-Steer Loader Caterpillar — Moving and spreading large quantities of Class 5 aggregate
- String Line — Establishing the target height for the paver surface and, by extension, the base layers
- Class 5 Aggregate — Creating the load-bearing base layer of the driveway