Excavation and the '3-Foot Rule'
At 2:03 in
Installing a Pond Start to Finish in 1 day
What happens here
The team begins the main excavation for the pond and waterfall area, working in a time-lapse sequence with multiple individuals using shovels and wheelbarrows to remove soil. Chris from Aquascape Inc. explains the '3-foot rule,' which involves spreading excavated dirt at least three feet horizontally from the pond's edge and tapering it down. This prevents a 'volcanic' look and helps blend the water feature naturally into the landscape. He also discusses the advantages of hand-digging for this size project (8x11 feet), citing less yard damage and easier creation of specific 'shelves' for the pond liner, as opposed to using heavy machinery which would be overkill and require more cleanup and shelf rebuilding.
Goal: Excavate the pond and waterfall, applying naturalistic berming techniques.
Tools and materials
- Garden Rake — Spreading and leveling the excavated dirt
- Shovels Various — Digging and shaping the pond and waterfall areas
- Wheelbarrows — Transporting excavated dirt
What they say
(1,919 characters)Hide
What they say
(1,919 characters)Auto-generated from the video audio.