Install Pre-Cast Concrete Steps
At 13:40 in
Installing a 15 x 30 Paver patio in 8 hours
What happens here
The final elements of the hardscaping are the pre-cast concrete step units leading from the deck to the patio. Due to their significant weight, these steps are handled using a combination of heavy machinery: a Kubota skid steer and an excavator, employing specialized straps for lifting. To ensure a tight fit and clean lines, the irregular ends of the pre-cast steps are carefully trimmed using a wet saw. The steps are then precisely placed, often requiring fine adjustments with the machinery and manual guidance from the crew. Care is taken to avoid scarring or marring the finished surfaces of the pre-cast steps, as their appearance is consistent throughout and damage would be noticeable. Two stone steps are installed on one side of the deck, and three on the other, creating symmetrical access points.
Goal: Install heavy pre-cast concrete step units for deck access.
Tools and materials
- Bobcat Mini Excavator Bobcat — Assisting with lifting and positioning step units
- Dust Mask — Respiratory protection during cutting
- Gloves — Hand protection during material handling and cutting
- Hearing Protection — Ear protection during cutting
- Kubota SVL 65-2 Skid Steer Kubota — Assisting with lifting and positioning step units
- Lifting Straps — Securing and lifting the heavy step units
- Pre-cast Concrete Step Units — Creating access steps from the deck to the patio
- Safety Glasses — Eye protection during cutting
- Wet Saw DeWalt — Trimming irregular ends of step units for precise fit