What happens here
Access the underfloor plenum by carefully lifting the raised floor panels. Once the plenum is exposed, begin running the specified electrical cables. In this project, six 10/4 MC (Metal Clad) cables are run from the existing Remote Power Panel (RPP) locations to the designated positions for the new network racks. Ensure the cables are plenum-rated for fire safety in this environment.
Goal: Route electrical cables under the raised floor to designated locations for network racks.
Tools and materials
- Cable Fishing Tools — Assisting in routing cables through confined spaces under the floor
- Raised Floor Panel Lifter — Safely lifting and moving raised floor panels
- Safety Gloves — Protecting hands during cable handling and installation
- Plenum-Rated 10/4 MC Cables — Providing electrical power to the network racks