Installing 3 New Network Racks Inside a Data Center, Thoughts? @dewalttv

0:53
489K views

Video by Hendy The Sparky

Hendy The Sparky

What happens here

This project guides through the process of installing new network racks and associated electrical lines in a data center environment. It covers the preparation of tools, the crucial task of running plenum-rated electrical cables under raised floors, creating knockouts in remote power panels (RPP), terminating breakers, and installing specialized pin and sleeve connectors to provide power for the new network infrastructure.

Transcript

Hide

Okay, day in the life as an electrician installing new network racks for a data center. Let's get right to it. So, the first thing I do is I wake up, I get my DeWalt tools together. My dad is a master electrician and we work together on jobs along with my brother. We are small contractor in New Jersey. Today's service calls that we have to install three new network racks for a data center. And in a data center, you have to run plenum rated electrical lines under the floor since they are fireproof. So, my job is that I had to run 6 10 4 MC cables from the RPP to the new network racks. RPP stands for remote power panel. My dad is using a DeWalt drill with a stepper bit to make a knockout inside the panel so we can feed our wires. We got our wires ran to the locations, installed six pin and sleeve connectors, and left the plugs under the floor so when the IT guys come to put the new racks in, they got power. Breaker terminations complete. Job complete. Customer satisfied. I put my tools away, and that's what a day looks like as an electrician.

Auto-generated from the video audio.