Site Grading and Laser Leveling

4:51
18:02
781K views

At 4:51 in

"Idiot Proof" Do it Yourself Deck Build - Step by Step Guide to Composite decks pt1

What happens here

Proper grading is essential for water drainage away from the house, preventing moisture issues and foundation damage. Use a laser level and measuring stick to precisely establish the subgrade. The goal is typically a 1-inch drop per 8 feet of run away from the house. If a laser level isn't available, an 8-foot board with a spirit level can be used to achieve the desired pitch. The skid steer is used to move and distribute dirt to achieve the correct grade, ensuring water flows away from the structure.

Goal: Establish proper subgrade pitch for drainage away from the house.

Tools and materials

  • Laser Level DeWalt — Precisely measuring and establishing the grade
  • Measuring Stick — Taking readings with the laser level
  • Skid Steer Bobcat S185 — Moving and distributing dirt for grading

What they say

Hide

up over time. So once we get the demolition complete, the next thing to do is to prepare the soil that's going to be beneath the deck. That needs to be pitched away from the structure. So, when you look at this grade behind me, it looks like it's got a nice taper running away from the house, but actually it's the reverse. Right now, the grade runs into the house. Looks can be very deceiving. That's why we're going to be using a laser to make sure that we get all the grades established. If you don't have a laser, you can use a level and an 8ft board to help you achieve your grades. Just simply pitch your board the way you want it, put the level on it, make sure that it's flowing the right way, and you're in business. But let me show you what I mean with the laser. Now, we're going to take a reading right at the house, and this is going to establish our point that we want the water to flow down and away from on an average of one drop, 1 in of drop per every 8t of run. Our first reading is coming in at 3'6. As we go further this way and the stick drops down, the number should get bigger. If they do the reverse, then our grade is set the wrong way. Now, this should be saying 3T 8, 3T 9, 3T 10, but instead it's saying 3T5. Meaning that we've instead of going down, we've just came up 1 in from that point. 3T 2 3T 3. So we've literally So we have come up three inches from this point to that point even though it looks like it's going the other way. It's not. The laser is telling us that this grade is coming up instead of going down. Now our eyes telling us one thing that the grades are flowing the right way, but the laser is telling us something completely different. And that means that this entire area right here needs to be shaved down. I'm going to trust the laser before I trust my eye. We want to make sure that all the water underneath the deck flows the right way. Hey guys, I want to jump in here and remind you to go visit Moisture Shields website because if it wasn't for those guys, this video wouldn't be possible. And I know this is going to help a lot of you guys build your own decks. So go check them out at moistureshield.com. Now guys, it's really important to establish the subgrade before you put your first footing in place because once the footings in place, you can't alter or change those grades very easily. Now that we've got all the grades set,