Footing and Post Installation
7:26
18:02
781K views
At 7:26 in
"Idiot Proof" Do it Yourself Deck Build - Step by Step Guide to Composite decks pt1
What happens here
After preparing the subgrade, transport pressure-treated lumber (e.g., green-treated) to the site. Use a skid steer with an auger attachment to rapidly dig footing holes to the required depth (e.g., 42-46 inches for frost footings). Pour concrete mix into the bottom of each hole to create a solid base for the support posts. Once the concrete is dry, place the lumber posts into the holes and use a string line and post levels to ensure they are perfectly plumb and aligned.
Goal: Install solid footings and plumb support posts for the deck.
Tools and materials
- Concrete Mix — Creating solid bases for the posts within the footing holes
- Post Level — Ensuring posts are plumb (vertically straight)
- Pressure-Treated Lumber — Support posts and framing
- String Line — Ensuring posts are aligned straight
What they say
(1,968 characters)Hide
What they say
(1,968 characters)Auto-generated from the video audio.