Backfill and Final Grading

11:36
26:03
1.6M views

At 11:36 in

I think we pissed off the neighbor...

What happens here

Begin the backfilling process by carefully placing clean rock over the installed drainage pipes, ensuring they are properly enveloped within the geotextile fabric. This 'sandwiching' of the pipes and clean rock prevents soil contamination and maintains the system's permeability. The dirty rock (soil mixed with small debris) or remaining excavated soil is then placed on top, as it functions similarly to clean dirt for the uppermost layer. Use the mini-excavator to move and spread the backfill material efficiently, ensuring proper compaction and a smooth, even grade away from the building's foundation. This step is critical for directing surface water away from the basement.

Goal: Backfill the excavated trench with clean rock, ensuring the geotextile fabric is properly positioned. The cleaner rock is laid first, followed by the more 'dirty' rock or soil, mimicking natural stratification for efficient drainage. A mini-excavator is used for efficient and controlled backfilling.

Tools and materials

  • Bobcat 325 Mini-Excavator
  • Rakes
  • Shovels
  • Clean Rock/Gravel
  • Dirty Rock/Soil

What they say

Hide

so we got to backfill this trench the muddy rock you go on top because it's no different than dirt it's not even muddy rock it's just dirty rock so that'll go on top all the clean rock is is sandwiched into the trench so we're good that way so we don't have to worry about it so if you guys are going why are you putting that dirty rock back on top well it's so different than just putting plain dirt on top