After acquiring land and obtaining the necessary building permits, the initial phase of construction begins with preparing the site. This involves significant excavation work to create a suitable building pad for the foundation, establish a functional driveway on the sloped terrain, and install essential utilities like the septic tank. Heavy machinery, such as excavators and skid steers, are used to clear vegetation, move large volumes of earth, dig trenches for utility lines, and accurately position the septic tank.

Goal: Prepare the land for construction and install initial utilities.

Tools and materials

  • Excavator
  • Septic Tank
  • Skid Steer
  • Utility Lines

What they say

Hide

to break ground. After acquiring three bids on the property, we finally landed on one. The excavators came out and gave us a rundown of what could potentially work with this property. Being on the hillside, this was supposed to be our original driveway. And this is where things went wrong. They took our money, they created us a pad, and they gave us a driveway, but the drive was completely unusable due to the slope. That was the most frustrating part to me because yes, you can drive up with a lifted truck, but not with a regular small SUV or even a sedan, making this property completely unusable. This brought us to our second bid. We hired Ultimate Excavation. They were incredible. For $30,000, they were able to create us a brand new driveway on the top, give it us a big, beautiful, wide enough of path to actually fit this cabin. And within that price point, they also included cutting into the utility lines and setting the septic tank and all the necessary supplies that come with that. Next up is the foundation and

Auto-generated from the video audio.