Pour Foundation and Frame Floor System
At 1:39 in
I Built a 2,000 Sq Ft Cabin With Zero Experience!
What happens here
The foundation is laid by pouring concrete footings according to the building plans. This forms the base upon which the entire structure will rest. Once the concrete cures, a team of framers prepares the area for the floor system. They install a vapor barrier over the soil within the foundation walls, followed by the careful placement and securing of floor joists. These joists are precisely cut and nailed using a pneumatic nail gun to create a level and sturdy base for the subfloor. Once the joists are in place, large sheets of plywood or OSB are laid down and fastened to form the subfloor, providing a stable working surface for subsequent construction stages.
Goal: Establish a sturdy concrete foundation and construct the floor system.
Tools and materials
- Circular Saw
- Concrete Forms
- Concrete Mixer Truck
- Floor Joists
- Level
- Measuring Tape
- Pneumatic Nail Gun (Framing Nailer)
- Subfloor Sheathing
- Concrete
- Nails/Screws
- Vapor Barrier